Risk Assessment and Remediation of Batumi Refinery
Site investigation, health and environmental risk assessment, feasibility study, and preparation of design documentation for remediation measures at the former refinery complex in Batumi.
Site investigation, health and environmental risk assessment, feasibility study, and preparation of design documentation for remediation measures at the former refinery complex in Batumi.
Client: Czech Development Agency Nerudova 3, 118 50 Praha 1
Country: Batumi, Georgia
Implementation period: 21 months
Completion date: August 2023
Contract Value: 9 711 100 Kč
The goal of this contract, financed by the Czech Development Agency, was to conduct a site investigation of the former refinery in Batumi, Georgia, contaminated with petroleum substances, polycyclic aromatic hydrocarbons, and heavy metals.
The site investigation included sampling of groundwater, surface water, sediments, soils, construction materials, and waste. The survey results were evaluated in a risk study, which led to the proposal of remedial measures and target limits for remediation. The project culminated in the preparation of design documentation for remediation measures, including the bioremediation of 921,000 tons of contaminated soil and the removal of 37,000 tons of petroleum sludge and hazardous waste.
The remediation design documentation will be used by local authorities to secure appropriate funding and select a contractor for the remediation of the entire former refinery site in Batumi.