Construction of Chobot pond
We carried out the construction of a new pond in KaÄŤice.
Client: Municipality of Kacice
Masarykova 20, 273 04 Kacice
Country: Czech Republic
Implementation period: 8/2019-12/2020
Contract value: 722,830 $
More about the project
The project included the creation of embankments along the Loděnice stream and the installation of functional structures such as an inlet pipe, safety spillway, discharge structure (weir), and a dry channel on the outlet side.
Additionally, a new shallow water zone with coastal vegetation was created to ensure the biological stability of the pond. The pond was designed and built as a retention reservoir, contributing to the management of water flow in the area and providing ecological and landscape functions.
We provided
-
Removal of the topsoil layer
-
Excavation work for pond bottom preparation and storage of excavated soil
-
Construction of new earth embankments along the Loděnice stream
-
Installation of inlet pipes
-
Construction of a safety spillway, dry channel, and discharge structure (weir) connected to the Loděnice river
-
Planting of new trees
-
Earthworks for embankment construction
Are you working on a similar project and could use our services?
Fill out a simple form and we will get back to you within 24 hours.
You can also reach us on the phone: +420 235 522 252